High-intensity rainfall has caused the first problems in the city of Vlora, where some of the main roads have been covered in water, despite the fact that the rain lasted for a short time.
A significant presence of water has been observed on "Ismail Qemali" Boulevard, Palmave Boulevard, as well as on several internal streets of the city's neighborhoods.
The sewage system has not been able to cope with the water flow in time, causing difficulties in circulation.
According to the Municipality of Vlora, Hidrovori has been put into operation, but is currently not operating at full capacity due to the lack of two pumps.
On the other hand, authorities indicate that the water is expected to recede within a short time, while the situation is caused by the overloading of the sewage system after intense rainfall.
