A defect has been registered at the NST of Spitalla in Durrës, causing temporary power outages in several areas.
According to preliminary information, the power supply was quickly restored through the ring lines, while the city of Durres was not affected by this problem.
The Spitalla NST supplies the areas from the Police towards Kënetë, Spitalla and the Rinia sector. The supply to these areas was restored within 15 minutes of the fault.
